YuFeng Electric Co,LtdAbout UsNo.1 Yufeng Road,Xixie Industrial Zone,North Baixiang Town,Yueqing city,ZhejiangNo.1 Yufeng Road,Xixie Industrial Zone,North Baixiang Town,Yueqing city,ZhejiangYuFeng Electric Co,LtdAbout UsNo.1 Yufeng Road,Xixie Industrial Zone,North Baixiang Town,Yueqing city,ZhejiangNo.1 Yufeng Road,Xixie Industrial Zone,North Baixiang Town,Yueqing city,ZhejiangYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Electric Co,LtdYuFeng Ele
Indoor voltage switchgear details listed as belows:
-Metal-Clad enclosed,good anti-corrosion and rust -air composite insulation -VCB withdrawable -Four compartments (VCB, busbar, cable terminal and LV) -Interlocking system -Wall mounted or back to back installation -Internal arc classified IAC AFLR (arc duct) -Motor operation for withdrawable VCB and earthing switch -Power automation system (optional)
Item
Unit
Data
Rated voltage
KV
36/38/40.5
Rated current
A
1250,1600,2000,2500
Rated frequency
Hz
50/60
Rated short circuit breaking current
KA
25,31.5
4s rated short time withstand current
KA
25,31.5
Rated short circuit making current (peak)
KA
63,80
Rated peak withstand current
KA
63,80
Insulation level
Rated lightning impulse withstand voltage
KV
185(phase to phase:215)
Main circuit 1min power frequency withstand voltage
KV
95(phase to phase:110)
Auxiliary circuit 1MIN power frequency withstand voltage
FAQ Q: Are you trading company or manufacturer ? A: We are factory with more than 20 years experience in this field.
Q: How long is your delivery time? A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q:Do your company have a website ? A:Please check :www.cnyufeng.cn
Q: What is your terms of payment ?
A: Payment=500USD, 30% T/T in advance ,balance before shippment.